- 2026-11-16 Plan amendments pending. Proposed amendments prepared for Bloomington’s transportation commission would incorporate the College–Walnut study and specify two-way traffic, protected urban trails and pedestrian improvements as the corridor’s long-term design; adoption and construction funding remain pending. copy of proposed transportation plan amendments B Square report
- 2026-11-02 Engineering contract proposed. Bloomington’s published board of public works agenda proposes a roughly $1.2 million Kimley-Horn contract for College–Walnut preliminary engineering, including signal replacements, crosswalk improvements and a College Avenue sidewalk while preserving one-way traffic. B Square report
- 2026-10-26 Chamber questions conversion. The Greater Bloomington Chamber of Commerce publishes concerns about College–Walnut conversion’s effects on business access, deliveries, parking and construction disruption, calling for comparison with targeted safety improvements. chamber commentary B Square report
- 2026-10-23 Separate safety projects clarified. Ryan Robling tells MPO policy committee member Scott Faris that two College–Walnut improvement phases totaling an estimated $14.4 million will preserve one-way traffic, with engineering design anticipated to start in 2027. B Square report
- 2026-10-22 Phased conversion assessment. Planning services manager Ryan Robling tells The B Square that phased two-way conversion is technically possible but could create confusing transitions and temporary infrastructure costs; the city has no bare-bones conversion estimate. B Square report
- 2026-10-21 Mayor rejects near-term conversion. Bloomington mayor Kerry Thomson tells Indiana Public Media that College–Walnut two-way conversion will not occur during her administration, citing cost and the need for coordinated construction. mayoral interview and transcript B Square report
- 2026-10-01 Two-way recommendation advances. Bloomington announces that planning staff recommend incorporating two-way College–Walnut traffic into the transportation plan, estimates full reconstruction at $109.4 million versus $103.1 million for the one-way alternative, and schedules commission review for Nov. 16 without committing construction funding. copy of city news release B Square report
- 2026-05-04 Retroactive extension proposed. Bloomington’s board of public works agenda includes a proposed extension of Toole Design’s College–Walnut contract from Oct. 31 to Dec. 12, 2025, placing both the original and proposed expiration dates months before consideration. copy of proposed contract addendum B Square report
- 2026-04-29 Pedestrian signal changes. Bloomington announces completion work on the first phase of traffic signal retiming, with pedestrian head-start intervals operating at College–Walnut intersections, including College Avenue at Sixth Street. copy of city news release B Square report
2025
- 2025-11-07 Feedback period continues. Bloomington staff continue collecting College–Walnut comments through online forms and corridor pop-up events, with no final recommendation expected before spring 2026. B Square report
- 2025-10-30 Second alternatives open house. Bloomington holds a second College–Walnut open house, retaining comments from the first session on large corridor drawings so participants can respond to earlier feedback. B Square report
- 2025-10-28 First alternatives open house. Bloomington holds the first of two October open houses where residents examine detailed College–Walnut designs and submit comments on one-way and two-way alternatives, both incorporating safety improvements. B Square report B Square report
- 2025-10-06 Two alternatives announced. Planning services manager Ryan Robling tells Bloomington’s plan commission that College–Walnut designs have been narrowed to improved one-way streets or two-way conversion, with public open houses scheduled for Oct. 28 and Oct. 30. B Square report
- 2025-04-22 Expanded study contract. Bloomington’s board of public works authorizes another $94,682 for Toole Design, bringing the College–Walnut study contract to $264,682 and adding analysis of 23 intersections beyond the original four, with designs for every intersection and a contract expiration of Oct. 31, 2025. B Square report
2024
- 2024-12-04 Safety planning framework. Bloomington’s city council unanimously approves the Safe Streets for All action plan, supporting the city’s zero-deaths-by-2039 goal and providing a policy framework for measures such as the pedestrian signal improvements later implemented on College and Walnut. B Square report B Square report
- 2024-08-28 Design funding gap. During Bloomington’s budget hearings, city engineer Andrew Cibor tells councilmembers that the proposed 2025 budget includes no funding to advance College–Walnut engineering beyond the corridor study’s anticipated 30-percent design stage. B Square report
- 2024-06-18 Design funding priority. Bloomington’s city council identifies engineering designs for College–Walnut improvements as a priority in its letter to the administration about the 2025 budget. copy of budget priorities letter B Square report
- 2024-02-15 Alternatives reviewed. The College–Walnut steering committee considers corridor districts and initial cross sections for both one-way and two-way configurations. copy of corridor study
2023
- 2023-11-16 Existing conditions review. The College–Walnut steering committee reviews existing conditions and their implications for developing corridor designs. copy of corridor study
- 2023-10-xx Speed measurements. Monitoring along College and Walnut finds that more than half of drivers exceed posted speed limits at 11 of 14 measurement locations. copy of corridor study
- 2023-10-04 Pedestrian signal policy. Bloomington’s city council adopts Resolution 23-17 by a 9–0 vote, directing preparation of plan amendments prioritizing pedestrian head-start intervals and automatic walk phases, policies later implemented along College and Walnut. copy of resolution B Square report
- 2023-08-xx Business delivery interviews. Bloomington staff interview College–Walnut businesses between Third and Eighth streets about deliveries, identifying simultaneous truck unloading on Walnut between Sixth and Seventh as a concern. copy of corridor study
- 2023-08-07 Steering committee begins. The College–Walnut study steering committee holds its first meeting, reviewing the project and identifying priorities. copy of corridor study
- 2023-06-15 Initial concepts. Toole Design presents preliminary College–Walnut cross sections at a public open house following a week of fieldwork, stakeholder discussions and design development. copy of corridor study B Square report
- 2023-06-13 Public design input. Toole Design holds a public meeting where participants identify College–Walnut assets, problems and desired improvements, including safer crossings, protected bicycle facilities, wider sidewalks and reduced vehicle speeds. B Square report
- 2023-04-xx Walking outreach. Bloomington staff begin April–May “Stroll and Discuss” events, gathering firsthand feedback about conditions along College and Walnut before the June design workshop. copy of corridor study
2022
- 2022-10-11 Corridor study contract. Bloomington’s board of public works approves a $170,000 Toole Design contract to study College and Walnut from the SR 45/46 Bypass to Allen Street, with president Kyla Cox Deckard abstaining over the firm’s previous two-way recommendation. copy of meeting packet containing Oct. 11 minutes B Square report
2021
- 2021-11-17 Protected bicycle crossing. Bloomington celebrates the opening of the 7-Line protected bicycle lane, which crosses College and Walnut at Seventh Street with dedicated bicycle signals. B Square report
- 2021-04-07 Turning restrictions. Bloomington’s city council votes 9–0 to adopt Ordinance 21-12, adding nearly 80 no-turn-on-red locations downtown and near Indiana University, including southbound College Avenue at Sixth Street. copy of ordinance B Square report
2019
- 2019-07-17 Transportation plan adopted. Bloomington adopts a transportation plan calling for a College–Walnut corridor study that considers two-way restoration alongside other options for improving pedestrian, bicycle, transit and automobile travel. city transportation plan B Square report
2018
- 2018-xx-xx Two-way recommendation. Toole Design recommends converting College Avenue and Walnut Street to two-way traffic during development of Bloomington’s transportation plan, while also recommending further corridor study. B Square report
- 2018-11-xx Recommendation removed. Bloomington’s plan commission removes Toole Design’s recommendation for two-way traffic on College and Walnut from the transportation plan before forwarding it to the city council. B Square report
1976
- 1976-xx-xx Highway bypass. State Road 37 opens west of Bloomington, providing an alternative to driving through downtown while College and Walnut retain their one-way configuration. B Square report
1956
- 1956-04-xx One-way conversion. Bloomington converts College Avenue and Walnut Street to one-way traffic under pressure from state highway officials seeking faster movement along State Road 37. B Square report
- 1956-04-23 Speeding concerns. Bloomington police Capt. Charles Fox reports excessive speeding on newly one-way College and Walnut, attributing it to the streets’ open appearance. copy of contemporary newspaper report B Square report